
Seven key points for your first import of Chinese machinery: ① Factory Verification (on-site or video check to confirm the factory’s legitimacy); ② Contract Terms (fully specify specs, delivery dates, warranty, and acceptance criteria); ③ 30/70 Payment (30% deposit + 70% before shipment; avoid full prepayment); ④ Certification Confirmation (CE/UL based on the target market); ⑤ FAT (Factory Acceptance Test) (test run with materials before shipment); ⑥ Logistics Selection (choose sea freight or OOG based on dimensions/weight); ⑦ Customs Documents (prepare Bill of Lading, Invoice, CO, and certifications)—take it slow with the first order; start small to build trust.
I. Supplier Verification
Factory Verification (inspect facilities and equipment via on-site visits or video);
Credentials (verify the authenticity of business licenses, export qualifications, and CE certificates); Platform (check Alibaba verification, factory audit reports, and transaction history); Trial Order (verify quality with a small initial order)—filter out “shell companies” (those without physical operations) using a three-step check: factory verification, platform certification, and small trial orders.
II.
Contract and Payment
Contract: Verifiable specifications; delivery deadlines with penalty clauses; 12-month warranty; FAT & SAT (Site Acceptance Test) requirements; arbitration clauses; Payment: 30% deposit + 70% before shipment (for the first order); Platform: Use Trade Assurance (funds released only after inspection); L/C: Use a Letter of Credit for large orders (>$100,000)—adopt a conservative payment structure for the first order (30/70 split + platform escrow).
III. Certification and Compliance
Destination Market Certification: EU CE (MD Directive + EC REP), US UL/NRTL, and others based on local regulations (e.g., BIS, SABER); Voltage & Frequency: Destination standards (110V/60Hz vs. 220V/50Hz); Manuals: Language versions for the destination market—certifications and specifications are “customized by market” (confirm before shipment to avoid high return costs).
IV. Machine Inspection and Logistics
FAT (Factory Acceptance Test): Test run with materials + video recording prior to shipment (confirm quality before dispatch);
Logistics: Calculate CBM and weight (<13 CBM for LCL/consolidated container; large items for FCL or OOG); Sea Freight: Southeast Asia (15–35 days) / Europe & US (25–40 days); Insurance: Insure at CIF value × 110%—dual protection via inspection and insurance (guaranteeing both quality and transit safety).
V. Customs Clearance and Delivery
Documents: Bill of Lading, Invoice, Packing List, Certificate of Origin (CO), and Certification package (ensure consistency across documents);
Preferential Certificates: FORM E or RCEP Certificate of Origin for tariff reduction; Customs Clearance: Handled by a customs broker in the destination country; Arrival & Acceptance: Port inspection + installation and commissioning (pay balance upon acceptance)—complete documentation + local broker = smooth delivery of the first order.
For overseas buyers importing Chinese machinery for the first time: verify the factory, arrange 30/70 payment terms, ensure market-specific certification, conduct FAT, secure marine insurance, and align all six customs documents.
Start with a small trial order to build trust before scaling up—slow and steady wins the race.