Skip to content
YUNENTROPY INTELLIGENCE  Product knowledge for global industrial buyersProducts · Suppliers · Sourcing Guides
YunentropyIndustrial Intelligence
Talk to us

What does a technical agreement for mechanical equipment include?

机械设备技术协议十大模块:设备规格→性能保证(可量化)→部件清单(品牌写死)→电气公用→标准认证(CE/ISO)→验收条款(FAT/SAT)→技术文件→安装培训→质保备件→通用条款;技术协议是合同技术附件、同等法律效力,验收以它为准。

What does a technical agreement for mechanical equipment include?

The ten key modules of a mechanical equipment technical agreement (Source: Imported equipment contract templates/procurement practices): ① Equipment specifications; ② Performance guarantees; ③ Component list; ④ Electrical utilities; ⑤ Standards and certifications; ⑥ Acceptance terms (FAT/SAT); ⑦ Technical documentation; ⑧ Installation and training; ⑨ Warranty spare parts; ⑩ General terms—the technical agreement serves as a technical annex to the contract and holds equal legal validity.

I.
Equipment Specifications and Performance

Equipment Description: Model/overall dimensions/weight; Performance Guarantees: Production capacity/cycle time/precision/load (must be quantifiable, e.g., positioning accuracy of ±0.01mm); Raw Material Conditions: Materials to be processed/humidity/viscosity (conditions under which performance is verified); Operators: Number of personnel required; Operating Mode: Continuous/intermittent (Source: Equipment contract specification guidelines)—performance guarantees must be measurable (vague terms like “good cutting quality” are unenforceable; Source: ABK).

II.
Component and Material List

Core Components: Brands and models of control systems, motors, guide rails, and lead screws; Materials: Material grades for the machine body and contact parts; Substitution Rules: Who determines “equivalence” if a replacement is needed (Source: ADH procurement list); Wear Parts: List and replacement intervals; Included Spare Parts: Details of spare parts supplied with the main unit—specify brands in the component list (to prevent downgrading or unauthorized substitution).

III. Electrical & Utilities

Electrical: Voltage/frequency/power/number of phases; Control: PLC brand/touchscreen/HMI interface language; Protection Class: IP rating (dust/water resistance); Utilities: Compressed air/water/steam connection specifications; Communication: MES/SCADA interface protocols—specify electrical parameters according to the destination country’s standards (e.g., 380V/50Hz vs. 480V/60Hz).

IV. Standards & Certifications

Standards: Applicable standards (ISO/GB/ANSI);
Safety: CE Machinery Directive/IEC 60204 electrical safety/OSHA; Certifications: CE/ISO 9001/UL/FDA (market-dependent); Certificates: Factory inspection report/material certificates/commodity inspection certificates—clearly define certification requirements (lack of certification = inability to enter the target market).

V. Acceptance Terms

FAT (Factory Acceptance Test): Trial processing at the manufacturer’s facility (using your materials/workpieces);
SAT (Site Acceptance Test): Trial operation after delivery and installation (actual measurement of capacity/precision); Acceptance Criteria: Test conditions/pass-fail criteria/scrap rate; Final Payment: Payment released only upon successful acceptance; Rectification: Timeframe for rectifying non-conformities—acceptance terms act as the “referee” for the technical agreement (omitting acceptance terms = inability to refuse delivery).

VI.
Technical Documentation

Document List: General assembly drawings/electrical schematics/operation manuals/maintenance manuals; Language: Manual language (English/local language); Format: Metric units; Packaging: Moisture-proof and rain-proof packaging for documents; Electronic Copies: CAD files/PLC program backups—technical documentation is the foundation for after-sales maintenance (missing drawings = inability to perform repairs).

VII. Installation, Training, and Warranty

Installation and Commissioning: Scope of Seller’s responsibility (installation guidance vs. turnkey service); Training: Content, number of trainees, location, schedule, and costs (included in the contract price?); Warranty Period: 12/18/24 months (commencing from the date of acceptance); Response: Fault response time (24h/72h);
Spare Parts Supply: Availability of spare parts during and after the warranty period—specify service terms in detail (clearly state who bears travel expenses).

VIII. General Terms

Price Fluctuations: Allocation of costs for changes in exchange rates, freight, or material prices; Delivery Delays: Liquidated damages ratio; Force Majeure: Definition and scope of exemption (based on SCM clauses); Intellectual Property: Usage rights for software and drawings;
Dispute Resolution: Arbitration body and applicable law—general terms safeguard against “unexpected issues” (appendices prevail in the event of a conflict with the main contract).

IX. Drafting Key Points

First, ensure quantifiability (specify numerical values for precision, capacity, and load); second, include drawings (layout drawings, foundation drawings); third, obtain joint signatures (technical, commercial, and legal departments); fourth, implement version control (revision history);
fifth, align with the contract (reference contract clauses within the technical agreement)—Technical Agreement for Mechanical Equipment: Covers ten major modules including specifications, performance, components, acceptance, documentation, and services (clear documentation provides the basis for acceptance).

Join the discussion

Your email address will not be published. Required fields are marked *

Chat with us Typically replies within a few minutes