Skip to content
YUNENTROPY INTELLIGENCE  Product knowledge for global industrial buyersProducts · Suppliers · Sourcing Guides
YunentropyIndustrial Intelligence
Talk to us

What documentation is required to import machinery and equipment into Brazil?

机械设备进口到巴西资料五件套:进口申报单DI(Siscomex系统)、商业发票+装箱单+提单、INMETRO证书/LPCO许可(NCM受控商品,证书编号在DI申报)、NR-12机械安全合规文件(CREA工程师ART技术责任书)、产地证;非葡语文件须翻译公证,二手设备每型号单独申请LI+限龄合规。

Required documents for importing machinery and equipment into Brazil

Five-piece document set for importing machinery and equipment into Brazil: ① Import Declaration (DI) (submitted by the importer or customs broker via the Siscomex system; includes product description, quantity, value, country of origin, and NCM code); ② Commercial Invoice + Packing List + Bill of Lading; ③ INMETRO License/Certificate (controlled NCM items require an LPCO import license; certificates can be verified on the INMETRO portal); ④ NR-12 Machinery Safety Compliance Documentation (includes an ART Technical Responsibility Statement signed by a CREA-certified engineer); ⑤ Certificate of Origin—documents not in Portuguese require professional translation and notarization (Huayu Testing Note: Customs has strict requirements regarding the standardization of translated documents).

I.
Basic Customs Clearance Documents

DI (Import Declaration) (Declaração de Importação: electronic declaration via the Siscomex system); Commercial Invoice (issued by the exporter: amount/model/HS-NCM); Packing List (number of packages/weight/shipping marks); Bill of Lading (Ocean Bill of Lading/Air Waybill); Certificate of Origin (for preferential tariff eligibility)—customs declaration cannot be filed if this set of five basic documents is incomplete (declaration must be filed within 90 days of arrival at the port).

II. INMETRO Certification

Check for Control Status: Search the NCM code in Siscomex and check the “TA” tab to see if the item is subject to INMETRO control; Processing: Controlled goods require certification from an INMETRO-accredited OCP body plus an LPCO license (which replaces the old LI import license); Declaration: The certificate number must be declared in the DI (Import Declaration), as Customs verifies data against the INMETRO portal in real-time; Timeline: The certification process is lengthy (ranging from weeks to months); complete this before shipment—check the controlled NCM list first (controlled items without certification cannot clear customs).

III.
NR-12 Machinery Safety

What it is: The Brazilian Ministry of Labor and Employment’s machinery safety regulation (NR-12); Proof of Compliance: An ART (Technical Responsibility Note) signed by a CREA-licensed engineer, a DCQ compliance report, and a complete technical dossier (this involves legal compliance documentation rather than just a “certification label”); Scope: Covers all powered machinery, including injection molding machines, CNC machine tools, sheet metal stamping equipment, packaging lines, lifting and conveying systems, welding equipment, woodworking machinery, etc.; Exemptions: Purely manual tools, etc.—The NR-12 compliance report is a mandatory check for imported machinery in Brazil (Customs will not accept the goods without the ART).

IV.
Special Requirements for Used Equipment

Licensing: Importing used equipment requires an LI license (applications must be submitted individually for each model and are subject to a “Public Consultation” process); Age Limits: Most used machinery is subject to age restrictions; Documentation: Model, specifications, photos, and appraisal/inspection documents; Prohibitions: Importing used equipment without the required license is prohibited—Importing used machinery into Brazil involves applying for an LI for each model and meeting age-limit compliance requirements (a much more complex process than for new machinery).

V. Process and Recommendations

First, check the NCM code (controlled attributes + tax rates); second, obtain certifications (INMETRO + NR-12; complete before shipment); third, prepare documents (DI/Invoice/Packing List/Bill of Lading/Certificate of Origin); fourth, arrange translation and notarization (professional translation of non-Portuguese documents + notarization); fifth, engage a customs broker (despachante aduaneiro: a specialized Brazilian customs clearance agent)—Required documents for importing machinery into Brazil: DI declaration + Invoice/Packing List/Bill of Lading + INMETRO certificate + NR-12 compliance report (ART) + Certificate of Origin;
key steps: check NCM first, obtain certifications before shipment, arrange Portuguese translation and notarization, and engage a Brazilian customs broker.

Join the discussion

Your email address will not be published. Required fields are marked *

Chat with us Typically replies within a few minutes